Solution · Metro

Metro viaducts, designed end to end.

From DPR to BOQ in one engine — substructure, superstructure, loading, validation and drawings. All clash-free, all auditable.

Request a Demo
Clash-free by construction
LIVE livdes://session · Hyderabad Metro
One model

Substructure to superstructure, in one model.

Generated, validated and drawn from a single source of truth.

One engine, end to end

From alignment to BOQ.

One model carries the whole viaduct — scroll through the workflow.

DECK · U-girder bearings pier cap pier shaft pile cap piles CH 100+040 CH 100+220
PIER P-09
height50.0 m
shaft Ø1800 mm
BoxU-girderI
Regenerated · all combinations re-validated
ANALYSIS · Pier 1 · 224 combinations ULS / SLS
M V BMD · SFD envelope
ComboDrivingAxialVzMy
SLS G Iaxial_min-8622.63393.25-7186.55
SLS G II aaxial_min-10036.56292.87-4486.89
SLS G II ashear_z_max-7463.52976.24-14423.91
Force extraction✓ all nodes
Geotech capacity✓ code-checked
Utilisation0.81 max
224 / 224 combinationsPASS · ULS / SLS
STN-3 STN-5 sight-line OK N 17.3856° · E 78.4867° CH 0+000 CH 0+267
Alignment on terrain · ROW checked
PIER P-09 · ELEVATIONVIEW A-A
€ TRACK€ ALIGN€ TRACK 9400 mm
SCALE 1:50LIVE · LINKEDDWG-S-104 · R03
Bill of Quantities −8% steel Live
RefDescriptionUnitQtyRateAmount
A — Substructure
A.1Excavation to formation level2,48018.5045,880
A.2Concrete piles 600mm dia.m1,920125.00240,000
A.3Pile caps — C40/50 concrete385165.0063,525
A.4Pier columns — C50/60 concrete620185.00114,700
A.5Pier caps — C50/60 concrete245195.0047,775
A.6Rebar B500B to substructuret1421,850262,700
A.7Formwork to substructure1,86042.0078,120
Section A Total852,700
B — Superstructure
B.1Precast beams supply & erectionnr963,200307,200
B.2In-situ deck slab — C40/50580175.00101,500
B.3Rebar B500B to superstructuret861,850159,100
B.4Post-tensioning strandt244,500108,000
B.5Waterproofing membrane3,20028.0089,600
Section B Total765,400
C — Ancillaries
C.1Elastomeric bearing padsnr481,25060,000
C.2Expansion jointsnr48,50034,000
C.3Drainage outlets & pipeworknr32420.0013,440
C.4Safety barriers — W2 parapetm640185.00118,400
Section C Total225,840
Updates with every change Total · 1,843,940
Review · Sub 17 · 3 active
DK
Daniel Kim14:32
Pier 7 bearing offset 28mm off — re-check after camber?
↳ Pier 7
SAM14:36
Offset traces to camber rev 14:20. Recommend revert.
3 on voice● recording
01 · STRUCTURAL

Substructure to superstructure, parametric.

Change a parameter — chainage, span, soil, load — and the model regenerates. Stations share the same model.

02 · LOADING & VALIDATION

Every combination. Every check.

Analysis-integrated. Forces, stiffness, geotech, ULS & SLS — validated before review.

03 · REAL-WORLD CONTEXT

Alignment, against the terrain.

Geo-referenced terrain catches sight-line, corridor and ROW conflicts before drawings.

04 · DRAWINGS

2D drawings, from the model.

Sections, elevations and plans auto-derived. Dimensions and schedules update with every change.

05 · OPTIMISE & COST

Live BOQ, alternatives, savings.

Rebar curtailment and configuration trade-offs. BOQ tied to your rate book, updated live.

Bring your viaduct.
We'll design through it on the call.

30 minutes. A real chainage, a real soil profile, a real BOQ at the end.