Give the alignment — LivDES builds the plan, profile and 3D corridor, places every structure along the chainage, and generates the Detailed Project Report. One model, one source of truth.
Drop in the survey — horizontal alignment, vertical profile, ground level and centreline. That is all LivDES needs to build the corridor.
One model carries the whole highway — scroll the workflow.
The centreline, carriageway, paved and earthen widths and ROW — plotted to scale with chainage at every interval.
The vertical profile rides the ground line — cuts, fills and gradients read at a glance, end to end.
Ride the corridor in 3D. Road surface, curves and grade — exactly as designed, at any chainage.
TCS, culverts, minor bridges, underpasses, ROBs, viaducts, junctions and ROW — positioned along the chainage.
Chapters from introduction to conclusion — synced to the model and exported as a ready DPR.
The corridor model is the foundation. Detailed design disciplines are landing next — generated from the same alignment.
Horizontal & vertical curves, super-elevation and sight distance — checked to standard.
Catchments, cross-drainage and longitudinal drains — sized against the profile and terrain.
Pavement, quantities and safety — the full DPR pipeline, generated from one corridor model.
Bring the alignment. SAM brings the corridor.